1 thought on “Exploration of Beilu Tian Coal Mine, Nobita Mine (Tianchi Energy Survey Area)”

  1. (1) Overview
    The survey area is located in the direction of 355 ° north of Jimusal County about 100 kilometers. The administrative division is under the jurisdiction of Jimusal County. The newly built Junior East Highway and Wuzhong Railway passed the south of the survey area, which was convenient for transportation. The terrain belongs to the residual seeding plain in the southern foot of the Clarmiri Mountain, with an altitude of 690 to 890 meters.
    From July 2012 to June 2013, the Ninth Geological Brigade of the Xinjiang Geological Mineral Bureau carried out survey work, the survey of mineral species was coal, the work extent was exploration, and the exploration funds were 21.51 million yuan.
    (2) Achievement description
    The eight Daowan group in the survey area contains a group A coal 1 floor, with an average thickness of 0.75 meters. The group contains 2 layers of coal C in group C, with an average thickness of 1.33 meters. The coal seams can be collected in the survey area, with an average of 32.75 meters thick. The main coal seams are B1 and B2. Both are partially combined or split. Both are simple structure and stable coal seams that can be collected in the region. Group B coal in the survey area is dominated by non -stick coal (31BN), and the second is Changyan Coal (41Cy).
    The amount of coal resources was 885 million tons (609 million tons of non -stick coal, and 276 million tons of long flame coal). Among them: (331) 284 million tons (non -sticking coal of 176 million tons and 109 million tons of long flame coal); (332) 230 million tons (non -stick coal of 171 million tons, long flame coal of 59 million tons); (333) 3.71 3.71 100 million tons (262 million tons of non -stick coal and 108 million tons of long flame coal). The reserves have passed the review. In addition, there are predicted resource (334) 1.11 billion tons.
    (3) The brief process of results
    The main physical workload is: 1: 1000 terrain and comprehensive geological measurement 48 square kilometers; 1: 5000 survey line section measurement 14 (40 kilometers), 40 kilometers), 40 kilometers, and 1: 5000 Drill 123 holes (25311 meters), 123 holes (24956 meters), 3 holes (times) of pumping tests, and 1392 sample tests (groups).

Leave a Comment

Shopping Cart