For the first time to decorate the house notes: just decorated the house, because all aspects of the decoration do not understand, so start from the basic aspects of attention, there are the following points:
1, housing construction period: the average family house decoration needs about 45-70 days. The larger the housing area, the longer the decoration cycle. Usually hard decoration decoration time is about 30-45 days, and soft decoration needs 5-10 days.
2, house decoration: the house is generally used in the whole package, the whole package, clear package three ways.
(1) all-inclusive: refers to the decoration company contracting labor and materials, save worry and effort, but cost money;
(2) half package: decoration company only production of construction and auxiliary materials, the main material to buy, the highest cost performance;
(3) clear package: decoration company only production construction, do not include main material or auxiliary materials, bother to work hard, but save money.
3, decoration materials:
Decoration materials mainly include two parts, main material and auxiliary material.
(1) Main material: generally can be easily measured building materials, such as wood floor, floor tiles, stone, lamps, doors and Windows, hardware, etc.;
(2) Auxiliary materials: it is generally inconvenient to measure auxiliary materials, such as cement, sand, gypsum board, putty powder, glue, paint, etc.
4, decoration points:
(1) hard decoration style to determine decoration;
(2) living room decoration to consider the location of furniture, appliances, especially the socket;
(3) the bedroom ceiling light is equipped with double control, and the position of the cabinet should be taken into account when installing it;
(4) Balcony, toilet to leave a certain slope to install floor drain.